|
Advanced Technologies
in the News
2/12/2007
Exxon Mobil uses Fenstermaker to perform
sonar scans of well structures and water
bottom in the vicinity of Lake Sand.
7/20/2007
Fenstermaker awarded dimensional control
project for CAMERON Subseas, testing deepwater
manifold connections for TOTAL.
10/10/2007
Omega Natchiq, Inc. secures Fenstermaker
for dimensional control services on BP Mardi
Gras Transportation System Project, Jumper
Fabrication.
11/08/2007
Fenstermaker to scan 3D model and provide
2D fabrication drawings for renovations
to chlorine caustic unit at Georgia Gulf
Chemicals and Vinyls in Plaquemine, LA.
1/10/2008
Fenstermaker forms new Surv360 Advanced
Technologies Division to support it’s Underwater
Acoustics, Laser Scanning and Dimensional
Control services.
01/21/08
Modjeski and Masters utilizes Fenstermaker
for inspection of the Mississippi River
I-10 Pier 5 Bridge Fender Damage.
5/12/2008
Advanced Technologies Division awarded 18
month dimensional control project for TOTAL
Port Authority refinery expansion project.
10/15/2008
Louisiana DOTD utilizes Fenstermaker to
provide specialized acoustic and laser scanning
surveying services to multiple dam site
throughout the state. Scope of services
includes asbuilt of structures, recurrent
deformation monitoring, underwater inspections
by divers and/or robotic equipment as well
as performing minor underwater repairs.
11/15/2008
Fenstermaker under contract to scan and
survey 3 subsea manifolds for BP-Atlantis
project under direction of Omega.
12/10/2008
Fenstermaker dimensional control services
under contract to provide large scale fabrication
support to Dynamic Industries, BP Whiting
Canada Crude Module Project.
1/12/2009
Dynamic Industries awards Fenstermaker large
modular Dimensional Control contract for
ExxonMobil, Sakhalin Project in Russia to
be fabricated at the Port of Lake Charles.
6/12/2009
Fenstermaker to conduct traditional and
topographic laser scan survey of ExxonMobil,
Mobile Bay Plant consolidation project lead
by JACOBS engineering Houston division.
7/17/2009
Survey and prepare permits for abandonment
and removal of the Exxon main production
platform in Lake Sand for Renaissance Petroleum
Company, LLC.
11/12/2009
Enbridge Offshore Facilities, LLC awards
Fenstermaker Topographic & Laser Scan As-built
of port facility located in Venice, La.
working in conjunction with JACOBS engineering
Houston division.
01/01/10
Fenstermaker, subcontracted through Sigma
Engineers & Constructors, Inc has begun
laser scan asbuilts of the TOTAL Low Vols
Phase 2 project. at the St. Gabriel, Louisiana
facility.
|